Energy in the 21st Century NEWS SERVICE

Vattenfall installs first turbine at 1.5GW Hollandse Kust Zuid wind farm

E21NS  E21NS  E21NS  E21NS  E21NS April 25, 2022 NSEnergy | The Netherlands | renewables: wind

E21NS

The 1.5-GW Hollandse Kust Zuid 18 km off the coast of the Hague will be the world's largest and first subsidy-free offshore wind farm when fully operational in 2023. The 140, 11-MW Semiens Gamesa turbines boast 200-m rotor diameters, stand 225 metres high, and are anchored to the seabed. The first 4 turbines were installed from the Wind Osprey.

johnkwhite: Home |E21NSpowered by quicpic (c) 2024 E21NS20220425NSE1